Skip to content
HAOZHAN STEELSteel Structure Co.

Saudi Arabia · Warehouse

Logistics Center Phase I, 9,000 m²

Heat-reflective roofing, 9 m clear height and 14 dock doors for a 3PL operator in Riyadh.

Location
Saudi Arabia
Completed
2024
Area
9,000 m²
Clear span
30 m
Steel tonnage
640 t

Designed for 50 °C summers: high-albedo roofing with a ventilated cavity, 100 mm PU wall panels and 9 m clear height for narrow-aisle racking. SAPMA-compliant fire exits and sprinkler interfaces were coordinated with the local authority.

Shipped via Jeddah Islamic Port, erected by our supervision team with a local crew of 18.

Logistics Center Phase I, 9,000 m² site photo 1Logistics Center Phase I, 9,000 m² site photo 2

Get a quotation for your project

One message is enough. Our engineering team takes it from there.

Your information is used only to answer this inquiry. No spam, ever.